Site Clearing in Preparation of a Winter Haven Parking Lot Paving

In order for your Winter Haven parking lot paving project to go according to plan in terms of installation and durability, you need to make sure that you have a strong foundation in place. One way to make sure that you end up with a proper paving installation is by clearing the site area.

However, how do you make sure that this process ends up being carried out properly? Read on to learn more about the site clearing process and find out the best way to pull this off properly and install your Winter Haven parking lot paving properly.

The removal of vegetation

One of the first things that have to be done for a site clearing is the removal of vegetation from the area. This means the clearing of trees, bushes, flowers, and even grass from the area. Not only is the area cleared, but anything within a 30 feet radius has to be removed.

The undergrowth is first removed, and then the larger pieces of vegetation like the trees and shrubs. Once that has been taken care of, things like tree stumps and large rocks are removed. You may be worried about not having any vegetation in your paving as it might affect the visual appeal of your paving, but it is possible for you to have a parking lot with vegetation planted.

The important thing to remember is that you should plan this out with your pavement contractor as they will know how to position your plants around your paving so that it doesn’t end up growing into the paving itself.

Soil clearing

After the vegetation has been cleared, you may assume that it’s time to have your Winter Haven parking lot paving installed. However, before that, you need to clear out your soil. Why, you ask? The reason why this needs to be cleared is that even after the removal of vegetation in the soil, there might still be roots left in the soil, which can cause it to grow into the paving, which can end up damaging it.

The soil clearing is done by the removal of the surface layer of the soil so that all of these roots and organic matter can be properly removed. Usually, the topsoil is transported somewhere else for use.

Once the surface layer has been removed, the remaining soil layer is then graded, which allows the paving contractor to get ready for the installation of the new parking lot pavement.