Four Major Concerns of Plant City Parking Lot Paving

It should be the goal of every city and town to build a Plant City parking lot paving. The city officials should aim to have a public parking lot for the residents of the town, city, or municipality. This is a great service to the people. However, constructing the parking lot isn’t as easy as 123. It takes a lot of time, money, and resources to build a parking lot for everyone.

Base

First, after finding a licensed contractor, the project head will receive a report about the soil condition in the area. The quality of the asphalt pavement will depend on the base and its elements such as depth, slope, and quality of the base layer. This is an important step because it will determine how long the parking lot will last. Remember that the base will need to support the whole structure.

Type and Quality of Asphalt

There are at least five types of asphalt mix: hot mix asphalt, warm mix asphalt, cold mix asphalt, porous asphalt, and custom mixes. These are the most popular types of asphalt mixes being used in the construction of roads and parking lots. In many states, they prefer using porous asphalt because it allows the water to seep through the surface into the ground. This asphalt mix will prevent standing water that weakens the stability of the pavement.

A parking lot or garage made of porous asphalt is very easy to maintain and it lasts for a long time. It’s not a surprise that many contractors and their clients prefer this type of asphalt.

Thickness of Asphalt

Anyone who has experience with pavements should be concerned about the thickness of the asphalt. The thicker the asphalt, the stronger and longer the pavement will last. That is not always the case, of course. There are many factors that affect the durability of the asphalt, including the slope of the paving and proper drainage.

Drainage

Drainage is another important component of a great asphalt pavement. Ensuring proper drainage means your pavement never has to suffer from standing water in your parking lot. Why should you concern yourself about it? Drainage problems are one of the major issues that can hound a Plant City parking lot paving for years. If the drainage system isn’t properly installed, that can cause huge problems in years to come. So, when constructing and building the parking lot pavement, put special emphasis on the drainage, too.

Tags: , , ,